The construction of our collection will start on 30.03.2023 and will be completed on 30.12.2024.
There are 164 independent sections in the 1st stage of our collection. We have 2+1 and 4+1 flat options.
SMART HOME SYSTEMS
FLOOR HEATING
COMBI (VAILLANT BRAND AND EQUIVALENTS)
BUILT-IN SET (3 PIECES) (FRANKE AND EQUIVALENTS)
AIR CONDITIONERS (MITSUBISHI AND EQUIVALENTS)
ALUMINUM DOOR AND WINDOW SYSTEMS
SHUTTER BOXES
HEAT AND SOUNDPROOF GLASSES
KITCHEN, BATHROOM, cloakroom CABINETS
BATH SHOWER CABINETS
OPEN PARKING
OPEN SWIMMING POOL
WALKING TRACK
TENNIS COURT AND BASKETBALL FIELD
POOL BAR
BBQ AREA
KIDS PLAYGROUND
AQUAPARK
PRIVATE BEACH (FREE TRANSFER FOR COLLECTION MEMBERS)
SOLAR ENERGY
PARKING GARAGE
RECEPTION
MEETING ROOM AND LIBRARY
ELECTRIC CHARGING UNITS
INDOOR SWIMMING POOL
FITNESS HALL
SPA AREA (SAUNA, BATH, STEAM ROOM, SALT ROOM, MASSAGE ROOMS)
MINI CLUB
MOVIE THEATER
PLAY AREA (BOWLING, BILORD, DART, FOOTBALL, PLAYSTATION)
CAFE
RESTAURANT